PORT CRANE SERVICE / STARKON
STS crane short rail replacement
The rail transition at the boom hinge needs close attention. We manufacture and install replacement short rail components, checking the support, transition geometry and alignment as part of the repair.



SCOPE OF WORK
Prepared around
your crane.
- Short rail and hinge-area inspection
- Replacement components prepared for the crane
- Support correction and machining
- Transition and alignment checks
The crane condition, engineering requirements and available access determine the final scope. We coordinate preparation and site work with your maintenance team.
COMPONENTS & FIELD EXPERIENCE
Parts and service.
Working together.
Replacement components can be coordinated with inspection, workshop preparation and installation.
Understand the problem
Impact and vibration at the boom hinge can point to wear or a discontinuity in the short rail transition. STARKON examines the rail ends, supporting arrangement and transition geometry before defining replacement components.
Prepare the workshop scope
Workshop preparation connects the measured hinge arrangement to the short rail components and their supports. The work can include manufacture of replacement sections, support correction and machining to the agreed crane-specific drawings.
Plan the on-site work
During installation, the condition of the rail bed and the alignment of the transition are checked together. Access, boom position and the available shutdown window shape the execution plan. The completed transition is assessed as part of the agreed handover.
Related project experience
FROM THE FIRST DRAWING TO THE JOB ON SITE
Talk to our team.
Send crane model, hinge arrangement and photographs of the joint. We will clarify the scope, specification and delivery or maintenance window with you.