STS & RMG trolley rail replacement
Complete replacement of block rail and A-profile trolley rail systems. We assess the rail, its fastening and the supporting rail bed together to address wear, vibration and poor trolley travel.



SCOPE OF WORK
Prepared around
your crane.
- Removal and replacement of trolley rails
- Rail pad and fastening replacement
- Rail bed correction and weld repairs where required
- Alignment of the installed rail system
The crane condition, engineering requirements and available access determine the final scope. We coordinate preparation and site work with your maintenance team.
COMPONENTS & FIELD EXPERIENCE
Parts and service.
Working together.
Replacement components can be coordinated with inspection, workshop preparation and installation.
Understand the problem
Wear at rail joints, movement in fastenings and irregular support can affect trolley travel. Before specifying replacement rails, STARKON reviews the running surface, rail profile, joints, pads, clips and supporting rail bed as one system.
Prepare the workshop scope
The preparation stage brings together the available drawings, measured geometry, component requirements and access arrangements. Rails, clips and soleplates are prepared to the agreed design; rail bed correction or machining is included where inspection shows it is needed.
Plan the on-site work
On site, removal, support repairs, installation and alignment are coordinated around the agreed crane shutdown. Geometry checks and the completed scope are recorded for handover. The aim is to address the support and alignment conditions behind the rail problem, as well as the worn rail itself.
FROM THE FIRST DRAWING TO THE JOB ON SITE
Talk to our team.
Send rail profile, crane drawings and available maintenance window. We will clarify the scope, specification and delivery or maintenance window with you.