The foundation of the upgrade: survey, structural assessment, extension design and a coordinated work pack.
CRANE SERVICE / UPGRADES
Engineering, portal heightening and boom girder extensions for existing STS cranes.

STARKON engineers and carries out crane upgrades, from the first survey and structural design to jacking, installation and handover. We heighten the crane portal to increase lift height under the spreader. Boom girder extensions are a separate upgrade to increase outreach.
Discuss your crane upgradeSTARKON provides the engineering for the upgrade. We establish the existing condition, assess the portal and leg structure, and develop the extension and its connections. Where the legs have no flange, the design includes a welded insert. The engineering brings the structural modification, temporary support, lifting arrangement and related crane systems into one work pack.
The survey, calculations, drawings, lift plan and welding sequence are coordinated before the crane stops. Site execution follows that project-specific engineering package.
Larger ships need more lift height under the spreader. Heightening the STS cranes you already have can be faster than buying new ones. Where the terminal layout allows the crane to be moved to a temporary work site, the berth can remain in service while the work takes place off the crane row.
Survey the crane and complete the engineering and work pack before the crane stops.
Prepare the jacking system and extension steel in advance of the outage.
Move and jack one crane at a time within the terminal’s agreed work window.
Fit and weld the new sections, align the structure and reinstate access and services.
Perform functional testing and hand the crane back for operation.
The foundation of the upgrade: survey, structural assessment, extension design and a coordinated work pack.
Raising the crane portal and installing new leg sections to increase the available lift height.
Extending the boom girder to adapt crane outreach to the required operating envelope.
More outreach requires a different modification from portal heightening. STARKON engineers and installs boom girder extensions, assessing the existing structure, connections and affected crane systems. The survey and required operating envelope determine the extension design and scope of work.

ZEEBRUGGE / +9 M
In Zeebrugge, Belgium, STARKON worked together with ZPMC to raise four ship-to-shore (STS) cranes by 9 metres. The project is a practical example of upgrading existing port equipment through close cooperation on site.